You don't have javascript enabled. Good luck with that.
Pencarian
Pengerjaan Sheetpile Bisa Kurangi Genangan Di Ulujami
.
photo Izzudin - Beritajakarta.id

Sheet Pile Construction Able to Eliminate Puddle

Jakarta Provincial Government commits to continue the construction of sheet pile along 900 meters which passing Pesanggrahan River in Perdatam housing complex and Mini Kontri in Ulujami Urban Village, South Jakarta.

The pump in Mini Kontri and Perdatam keeps running. We’re ready with the flood

Tri Kurniadi, South Jakarta Mayor, said that the inundation around the area will decrease if the sheet pile construction is done.

“The pump in Mini Kontri and Perdatam keeps running. We’re ready with the flood,” he said, Sunday (12/20).

Land Acquisition Hampers Sheet Pile Installation in Pesanggrahan

According to him, the construction is still postponed due to waiting the land buying process in National Land Board.

“The documents are being processed, but we need more personnel to complete the mapping,” he added.

His side has instructed Dept. of Water Management to provide a statement that the land has been paid.

Linked News
Popular News indeks
  1. MSMEs Bazaar Held at Binus Anggrek Campus

    access_time30-10-2024 remove_red_eye966 personTP Moan Simanjuntak
  2. 250 High School Students in N. Jakarta Learn to Create Digital Content

    access_time01-11-2024 remove_red_eye779 personBudhi Firmansyah Surapati
  3. 18 School Principals Participate in Public Agency E-Monev Presentation

    access_time02-11-2024 remove_red_eye445 personFolmer
  4. South Jakarta City Government Accelerates Stop BABS

    access_time31-10-2024 remove_red_eye410 personTiyo Surya Sakti
  5. Tanah Tinggi Residents Participate in Computer Operator Training

    access_time02-11-2024 remove_red_eye351 personBudhi Firmansyah Surapati