You don't have javascript enabled. Good luck with that.
Pencarian
Pengerjaan Sheetpile Bisa Kurangi Genangan Di Ulujami
.
photo Izzudin - Beritajakarta.id

Sheet Pile Construction Able to Eliminate Puddle

Jakarta Provincial Government commits to continue the construction of sheet pile along 900 meters which passing Pesanggrahan River in Perdatam housing complex and Mini Kontri in Ulujami Urban Village, South Jakarta.

The pump in Mini Kontri and Perdatam keeps running. We’re ready with the flood

Tri Kurniadi, South Jakarta Mayor, said that the inundation around the area will decrease if the sheet pile construction is done.

“The pump in Mini Kontri and Perdatam keeps running. We’re ready with the flood,” he said, Sunday (12/20).

Land Acquisition Hampers Sheet Pile Installation in Pesanggrahan

According to him, the construction is still postponed due to waiting the land buying process in National Land Board.

“The documents are being processed, but we need more personnel to complete the mapping,” he added.

His side has instructed Dept. of Water Management to provide a statement that the land has been paid.

Linked News
Popular News indeks
  1. Free Additional Nutritious Food Distributed to 31 Toddlers in Kalibata

    access_time13-09-2024 remove_red_eye1147 personTiyo Surya Sakti
  2. Jakarta Women's Football Team Ready to Face West Java at PON XXI Final

    access_time13-09-2024 remove_red_eye846 personFolmer
  3. Water Channel Dredging on Bendungan Melayu Reaches 50 Percent

    access_time18-09-2024 remove_red_eye826 personAnita Karyati
  4. Jakarta Leads Medal Standing at PON XXI

    access_time17-09-2024 remove_red_eye778 personFolmer
  5. PON XXI Temporary Standings: Jakarta Continues to Shadow East Java

    access_time13-09-2024 remove_red_eye755 personAldi Geri Lumban Tobing